PDA

View Full Version : Wedgetail at Richmond


Chris Griffiths
26th January 2009, 03:53 PM
Sources tell me that a Wedgetail appeared at Richmond a couple of days back.
He said it was silver but on further questioning said it might have been a greeny silver colour.

Down from BNE for a quick paintjob perhaps?

Mobility challenges have prevented me checking this out.

Chris

phil.l
26th January 2009, 04:04 PM
Chris the wedgetail is N361BJ C/N 33477

Drew H
26th January 2009, 04:06 PM
I didn't see it myself, but my dad did.
Twas N361BJ, still unpainted, but now with surfboard on top.

Scott Lindsell
26th January 2009, 04:48 PM
Can someone confirm this registration or what RAAF number it will carry. I have now shot four Wedgetails but none bare this rego.

N378BC '001'
http://www.flickr.com/photos/bfiguy/2182278248/

N358BJ '002'
http://www.flickr.com/photos/bfiguy/2479287311/

N359BJ '003'
http://www.flickr.com/photos/bfiguy/2235362353/

N364BJ '004???'
http://www.flickr.com/photos/bfiguy/2116549715/

Cheers,
Scott :)

Andrew McLaughlin
26th January 2009, 04:51 PM
Can someone confirm this registration or what RAAF number it will carry. I have now shot four Wedgetails but none bare this rego.

N378BC '001'
http://www.flickr.com/photos/bfiguy/2182278248/

N358BJ '002'
http://www.flickr.com/photos/bfiguy/2479287311/

N359BJ '003'
http://www.flickr.com/photos/bfiguy/2235362353/

N364BJ '004???'
http://www.flickr.com/photos/bfiguy/2116549715/

Cheers,
Scott :)

The one at Richmond will be 004 Scott. 005 and 006 are still in the hangar at Amberley. 004 is at Richmond being painted, and will be making an appearance at the Avalon Airshow next month. I think N364BJ is 005 or 006?

Cheers

Scott Lindsell
26th January 2009, 04:55 PM
Thanks for the speedy reply Andrew! I'm sure I must have a shot of it bare metal in my library somewhere but the entry did not pop up straight away. Bad bookeeping on my part I guess :o

Kain C
26th January 2009, 08:15 PM
Anyone catch the callsign used?

Andrew McLaughlin
26th January 2009, 08:48 PM
Anyone catch the callsign used?


Probably a Boeing callsign at the moment...

Bernie P
27th January 2009, 08:23 PM
Could it have had anything to do with this Boeing announcement...

SEATTLE, Jan. 15, 2009 -- The Boeing Company [NYSE: BA] today announced it has completed the first aerial refuelings of a 737 platform. The historic flights were conducted for Project Wedgetail, Australia's airborne early warning and control (AEW&C) program.

Flying at 25,000 feet above Edwards Air Force Base, Calif., on Jan. 7, Boeing pilot Ron Johnston maneuvered the 737-700 AEW&C aircraft into a U.S. Air Force KC-10 tanker's refueling boom envelope and easily maintained its position below the tanker. The 737 received approximately 14,000 pounds of fuel during two connections with the tanker.

"The aircraft was stable, with excellent flying qualities and engine response behind the tanker," said Johnston.

The aircraft achieved another aerial-refueling first on Jan. 10, when it received fuel from an Air Force KC-135 tanker.

"The 737 AEW&C aircraft's highly automated and efficient refueling system worked flawlessly in both tests," said Maureen Dougherty, AEW&C Program vice president for Boeing. "This is a key milestone in certifying the AEW&C system.

"Air-to-air refueling is a force multiplier for the AEW&C aircraft," Dougherty added, "allowing it to stay on station for significantly longer periods of time while providing critical battle-management and surveillance capabilities."

Project Wedgetail includes six 737 AEW&C aircraft plus ground support segments for mission crew training, mission support and system maintenance.

There is a pic inside the article, but not sure about posting it here so go and have a look...

Source: - Boeing.com (http://boeing.com/news/releases/2009/q1/090115a_pr.html)

Steve V
27th January 2009, 10:34 PM
Anyone catch the callsign used?

Boeing 203

Mike W
28th January 2009, 05:57 AM
"Air-to-air refueling is a force multiplier for the AEW&C aircraft," Dougherty added, "allowing it to stay on station for significantly longer periods of time while providing critical battle-management and surveillance capabilities."

Refueling the 737 AEW&C (assuming it has similar capacity and consumption to a regular 737) must give it the ability to spend some serious time in the air. Do they have alternative crew shifts or what?

damien b
28th January 2009, 07:17 AM
Refueling the 737 AEW&C (assuming it has similar capacity and consumption to a regular 737) must give it the ability to spend some serious time in the air. Do they have alternative crew shifts or what?

Going by what the RAAF does with long range P-3 and C-130 operations and the USAF with long E-3 patrols, extra crew would be carried by the 737 if air to air refueling was scheduled to take place and a long patrol was planned. Would it be double the crew - that would depend on automation, crew rest facilities and room.

Greg McDonald
13th July 2009, 03:20 PM
Latest on the Wedgie:

Australia's first two Wedgetail surveillance aircraft remain on target for delivery by the end of November, but full capability of the advanced radar could still be two years away.

The aircraft was now ready to be used for training and initial operations, director of the Wedgetail project Air Vice Marshal Chris Deeble said.

"But there are some aspects of the radar that we are going to have to further develop," he told reporters in Seattle.

"There is more work that we are going to have to do which may take a up to a couple of years beyond where we are to get to that final stage."

Under the $3 billion Wedgetail program, Australia is buying six Boeing 737 aircraft equipped with the advanced MESA radar, able to watch over a vast area of sky and direct fighters to intercept intruders.

The aircraft were slated for introduction to service in 2006 but technical problems with the radar have resulted in major delays, leading to speculation within defence the project might need to be cancelled.

There now have been significant advances.

A study conducted by US radar expert Lincoln Laboratories concluded the radar architecture was fundamentally sound.

And real-life trials conducted over the Northern Territory concluded the radar worked effectively at controlling fighter interception of intruders, subject to some reservations.

The key remaining radar problems relate to its clutter performance - the ability to detect targets such as low-flying aircraft against a ground or water backdrop in certain circumstances - side lobes - extraneous radar signals which could create false images - and stability, where some combinations of operator commands cause mission computers to halt temporarily or even lock up.

Two aircraft, with limited capability, will be delivered to the RAAF on November 30, with four others - in full configuration - delivered between March and September 2010.

The first two aircraft will then be upgraded to full specification.

Boeing says it is proud to have its name on the Wedgetail, describing it as a highly-advanced capability.

"This is so frigging powerful," Wedgetail project manager Maureen Dougherty said.

"The Australian people are going to be so proud of this capability".

I love the quote from Maureen 'frigging' Dougherty...

I wonder if this country has EVER bought anything for the defence forces that has been working as promised in the promised timeframe. It seems that everything we buy costs us 3 times as much as budgeted for, is delivered massively late and never works the way it was intended. Says a great deal about those charged with making purchase choices...

damien b
13th July 2009, 06:39 PM
When you are the first customer (as Australia is in this case, and many others where budgets have blown out) it is very hard to accurately forecast problems with the project. Delays, cost overruns etc have to be expected to a degree, especially a complex project like this. Even the most experianced aircraft manufacturers (Boeing and Airbus) have experianced cost overruns and schedule delays. The people in Defence running these projects are no better than those in Boeing etc.

Bob C
13th July 2009, 08:46 PM
F/A18F seems to be going OK at this stage - the first aircraft was delivered three months early and under budget.

Note : we didn't attempt to "Australianise" this aircraft which may have caused problems with some recent purchases.

Nathan Long
13th July 2009, 09:55 PM
I think that the problem in many cases is that we are limited in the numbers of new defence items that we buy and try to make up for it by trying to increase capability.

I reckon that 40 years ago, there were plenty of people calling for the cancellation of the F-111 too...