Quote:
Originally Posted by Brendan Lawrence View Post
The Telstra Exchange
Im going to be picky here

Every Telstra exchange in the country (definetly capital city ones) have batteries redundant for up to 6 hrs, but once the power fails these are only used to keep power up for 2-3 seconds until the onsite diesel generator kicks in.

What JQ's is hosted in is a data centre - and every decent data centre all over the world has backup generators, all serviced by petrol companies on individual contracts.

So i would think that the data centre probably experienced equipment failure rather than a power outage. (Or perhaps the generator failed to start).

Thrilling stuff, but this thread is now locked before it turns into something not suited to these forums -mod