The Boeing 787 Dreamliner has now completed all the flight testing required for certification with the FAA.
- 1700 Flights
- 4800 Hours
- 25,000 Test conditions
- Startup at -42C
- 100s of Stalls
- Fierce crosswinds and wet runways
- Flying at the lowest posible speed to almost the speed of sound
- Ultimate rejeced takeoffs
- Tail on the ground to measure mintakeoff speed
Congratulations to the Boeing Dreamliner team, reaching certification for any aircraft development project is an amazing achievement.