Thread: The new Ikea
View Single Post
  #14  
Old 4th November 2011, 11:24 AM
Nigel C Nigel C is offline
Prolific Member
 
Join Date: Mar 2008
Location: The farm
Posts: 4,022
Default

There were many crane operations permitted on the site during daylight and non-curfew periods, and in fact there are still some crane ops happening during the day on their new head office building next door (the clock tower). Very strict operating heights were/are imposed on the site, and the sloped roof on the eastern side was also designed to fit in with these OLS requirements.
__________________
I am always hungry for a DoG Steak! :-)
Reply With Quote