![]() |
![]() |
|
#1
|
|||
|
|||
![]()
QANTAS operated the one off SYD to LHR via SIN QF5, A380 flight with VH-OQE departing SYD late on Sunday night. See posts 8 & 13 for further information.
After a late afternoon arrival in LHR on Monday the A380 departed at 19:33 for the 1 hour 36 minute flight to DRS where it will be the first QANTAS A380 to have its cabin refurbishment done. Does anyone know how long the refurbishment is scheduled to take for each aircraft? The 2017 QANTAS Press Release said that the refurbishment would take until the end of 2020, which if done without much of a break between aircraft would be upwards of a month and a half for each one. Possibly work will be suspended during the December to March peak when QANTAS will use an A380 on QF127/128 to HKG, although the schedule could be operated with 11 aircraft. |
#2
|
|||
|
|||
![]()
A one-time extension of the seasonal QANTAS QF17/18 service from LAX to MCO on 19 January, 2020 & return on 24 January, 2020. The A380 must re-position back to LAX after the outbound flight and onto MCO to operate the return flight five days later.
Quote:
|
#3
|
|||
|
|||
![]() Quote:
Dave C |
#4
|
|||
|
|||
![]()
I see OQA went tech at LAX last night and QF94 was cancelled. Interesting that they in turn cancelled QF93 back to LAX this morning and opted to turn OQF back around and head back to SIN. Must mean the load factor was higher to SIN than LAX today?
|
#5
|
|||
|
|||
![]()
There may have been greater flexibility and more options to transfer passengers to SYD to fly on QF11, or to BRI to fly on QF15 as there was plenty of notice to arrange this after QF94 was cancelled.
In addition, any further passengers could be transferred today to SYD to fly on QF73 to SFO and transfer to LAX or the later QF49 from MEL to SFO and transfer to LAX. |
#6
|
|||
|
|||
![]()
OQG has gone to DRS today as QF6005, OQE has yet to depart, is she due back in service?
|
#7
|
|||
|
|||
![]()
It looks as though OQE will re-position to LHR to replace OQG and operate QF2 which leaves Wednesday evening at 21:05. As the flight from DRS is just over 1:30 it should be leaving in the next hour or so.
That means that the first cabin refurbishment has taken about 16 days to complete. It is a pity that the first A380 to have the refurbishment is not in the new QANTAS livery. OQG is though. |
![]() |
Thread Tools | Search this Thread |
Display Modes | |
|
|