Sydney Airport Message Board Sydney Airport Message Board  

Go Back   Sydney Airport Message Board > Aviation Industry News and Discussion > Australia and New Zealand Industry


Reply
 
Thread Tools Search this Thread Display Modes
  #811  
Old 29th April 2020, 01:57 AM
Peter C Peter C is offline
Member
 
Join Date: Aug 2019
Location: WA
Posts: 243
Default

The first 787-9 to operate into South Africa, VH-ZND has just touched down into Johannesburg after 13 hour 31 minute flight from Melbourne. TV reports indicate it will return via Cape Town and Perth to Melbourne.
Reply With Quote
  #812  
Old 30th April 2020, 11:20 AM
Peter C Peter C is offline
Member
 
Join Date: Aug 2019
Location: WA
Posts: 243
Default

Re previous post, seems the local TV reporter got mixed up with flights, as VH-ZND is currently enroute JNB - MEL direct as QF7026. The other flight was completed by SAA A340 ZS-SNC as SA2280 yesterday.
Reply With Quote
  #813  
Old 11th May 2020, 10:55 AM
Greg Hyde Greg Hyde is offline
Prolific Member
 
Join Date: Sep 2008
Posts: 4,428
Default

Qantas hits pause on new Boeing 787, Airbus A321neo jets

Qantas will join other airlines around the world in pushing back on the delivery of new jets until the worst of the coronavirus has passed and the shape of the post-pandemic travel market is clearer.

Qantas will defer the delivery of its last three Boeing 787-9 aircraft due to arrive by the end of this year, which would have seen the Dreamliner fleet top out at 14 and allow the retirement of the Boeing 747s – although the now-grounded jumbo jets are now less likely to be put out to pasture than simply not return to the skies at all.

Also put on ice: Jetstar's Airbus A321neo LR aircraft, the first of which was slated for delivery in August with all 18 streaming through by the middle of 2022.

The long-range jets, decked out in a 232 seat all-economy configuration, were earmarked for a mix of domestic and selected international routes such as Sydney to Bali, along with potential new low-cost corridors such as Melbourne-Fiji and Cairns-Auckland.

A Qantas spokesman confirmed to Executive Traveller that the airline has advised Airbus and Boeing it won’t be taking delivery of any new aircraft in the short term.
An unsteady return

Most of the airline's jets are already grounded, awaiting the gradual return of domestic travel, but international travel – barring the opening of a local 'bubbles' to the likes of New Zealand and other nearby Pacific islands – isn't expected to resume until 2021, while a stabilised 'new normal' may not arrive until 2023.

Qantas Group CEO Alan Joyce last week said the airline had acted quickly to conserve cash, hitting pause on almost all capital and operating expenditure as well as implementing employee stand-downs, and raising $1.6 billion in loans against ten of its Boeing 787-9s as it weathers the coronavirus storm.

"It is hard to predict what the demand will look like and recovery is likely to be slow," Joyce admitted.

"There's a lot we don't know about life on the other side of the crisis, but our starting assumption has to be that the market won't return to demand levels we had going into the crisis. The market will probably be smaller for some time."

Despite a forecasted "net cash burn rate of $40m a week by the end of June", Joyce said this was "a lot lower than most airlines around the globe, and we have a light at the end of the tunnel with domestic and trans-Tasman markets potentially opening up before any other markets."
Reshaping and right-sizing

Joyce told Executive Traveller that the airline would launch a sweeping review of its entire international fleet to reshape the airline around post-coronavirus travel demand, because "the Qantas of 2021 and 2022 will not be the Qantas of 2019."

This could include fewer Airbus A380s, with the airline halting its refurbishment plan – only six of the 12 superjumbos have been upgraded with new business class seats and inflight lounges to free up cash in the short term, until it's determined how many A380s will be needed in this uncertain future.

"There is a potential to bring all 12 (A380s) back (into service), but there is a potential to bring less than 12 back," Joyce says of the airline's flagship jets. "That will depend on what the recovery scenario looks like."

Joyce also confirmed that ambitious plans for non-stop Project Sunrise flights to London, Paris and New York have been put on hold, along with an order for the Airbus A350-1000 jets which would have tackled the marathon 18-20 hour journeys.

"We do think there is a huge potential for Project Sunrise but the time is not right now, given the impact that COVID-19 has had on world travel," Joyce reflected. "But we do think there's still a good business case for it, and a good opportunity."

https://www.executivetraveller.com/n...neo-deliveries
Reply With Quote
  #814  
Old 15th May 2020, 03:01 PM
Dennis McLean Dennis McLean is offline
Member
 
Join Date: Mar 2008
Posts: 839
Default

VH ZNL showing - undergoing final assembly - as at 14 May.
Reply With Quote
  #815  
Old 15th May 2020, 03:19 PM
Greg Hyde Greg Hyde is offline
Prolific Member
 
Join Date: Sep 2008
Posts: 4,428
Default

They may complete the aircraft but not deliver until QF is ready.
Reply With Quote
  #816  
Old 21st May 2020, 01:51 PM
Peter C Peter C is offline
Member
 
Join Date: Aug 2019
Location: WA
Posts: 243
Default

FWIW, Payne Field Blog said on 20th "ZB338 Air France 787-9 line 1013 was moved out of the factory last night", which means with odd numbers only at Everett, line 1019 VH-ZNL will have moved to P2.
Reply With Quote
  #817  
Old 29th May 2020, 02:04 PM
Peter C Peter C is offline
Member
 
Join Date: Aug 2019
Location: WA
Posts: 243
Default

Again,FWIW, Payne Field Blog said on 27th "Scoot 787-8 line 1015 came out of the factory on May 25", which means line 1019 VH-ZNL will have moved to P3.
Reply With Quote
  #818  
Old 1st June 2020, 04:39 PM
Greg Hyde Greg Hyde is offline
Prolific Member
 
Join Date: Sep 2008
Posts: 4,428
Default

ZNC landing at BNE with Vortices

https://twitter.com/AeronewsGlobal/s...340457472?s=20
Reply With Quote
  #819  
Old 11th June 2020, 12:30 PM
Peter C Peter C is offline
Member
 
Join Date: Aug 2019
Location: WA
Posts: 243
Default

Jennifer Schuld's Twitter feed https://twitter.com/JenSchuld yesterday (10th) shows Turkish Airlines 787-9 TC-LLN on it's first (B1) test flight.
As line number 1017, that puts VH-ZNL (ln 1019) in at least position 4 or in the paint shop - it's not visible in any of backgrounds to the TC-LLN pictures.
Reply With Quote
  #820  
Old 11th June 2020, 10:46 PM
James Smith James Smith is offline
Senior Member
 
Join Date: Mar 2008
Location: Cherrybrook NSW
Posts: 1,343
Default

QANTAS has advised the replacement of equipment for JNB and HND from 744 to 789 from the start of the NS schedules in 2021. This implies that the 744 will be brought back to operate these two routes at some stage leading up to the replacement date.

Quote:
Qantas Airways in late-May 2020 filed aircraft changes for selected long-haul routes, scheduled from late-March 2021. Initial operational aircraft changes as follows.

Sydney – Johannesburg eff 28MAR21 787-9 replaces 747-400, increase from 6 to 7 weekly
Sydney – Tokyo Haneda eff 28MAR21 787-9 replaces 747-400, 1 daily
Source: Routes Online
Reply With Quote
Reply

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT +10. The time now is 01:42 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Copyright © Sydney Airport Message Board 1997-2022
Use of this web site constitutes acceptance of the Conditions of Use and Privacy Statement