Quote:
Originally Posted by James Smith
The first A220-300 (MSN 55253) was scheduled to be delivered in November this year but is still in production and hasn't made an appearance out of the factory in Montreal. From roll out to delivery can take up to three months or longer, so it looks as though it will not be delivered until early 2024.
|
MSN is 55236, line number is 55253, it’s interesting how all the production lists have the msn as the line number