Thread: Qantas 787
View Single Post
  #662  
Old 16th November 2019, 11:30 AM
Peter C Peter C is offline
Member
 
Join Date: Aug 2019
Location: WA
Posts: 243
Default

Quote:
Originally Posted by James Smith View Post
I wonder if while having an extra 787-9 in the fleet ZNJ can assist QANTAS for the next week or so while OQB is still having its door repaired?
The repair to VH-ZNG after damage by a ramp vehicle back in January at Melbourne, took 23 days to fix (3+ weeks). So it's very much a matter of how much damage was done to OQB, as to how long its out of service (8 days so far).
Reply With Quote