#41
|
||||
|
||||
![]() Quote:
Not overly much to say, as nothing notable has really happened! *Roadworks surrounding the airport have been completed *Work has started on the bi-level roadway for arrivals and departures *Scaffolding is being slowly removed from the carpark and terminal, the sides facing the current terminal building are now clear as the facade is being completed (On the carpark atleast) Other than that looking inside the building it is progressing well. Glass is in place on what will be the departures hall, escalators are in, looks as though it will be ready soon for internal work (If not already commenced). Had a look while wandering through the multi-storey carpark looking for lost wheelchairs. ![]() The south wing, showing the temporary wall where the Western wing will connect with the building ![]() The Carpark and current Terminal road, which has been shortened twice to its current position just at the edge of the current terminal building ![]() The Airliner has been moved from the drop off zone to the Bus Zone from the Taxi rank, and now has a nice new Bollard sign signifying its new location ![]() One of the 'Billboards' displaying Yesterday, Today and Tomorrow along Fairbairn Avenue ![]() The new Australian Air Express freight centre ![]() The terminal approach roads under construction aswell as the new Carpark ![]() A View of the completed Fairbairn Avenue overpass and access roads to the Airport
__________________
View My Photos at http://flickr.com/photos/kommissar_todd06 |
#42
|
|||
|
|||
![]()
I thought I would bump this thread with a question for those in the know. Has an opening date for the first half of the new terminal been confirmed yet? I've looked at the Canberra Airport website and there is no information other than a broad August/Sept opening and the live webcam, which is showing that the new elevated roadway is being built but no progress on the terminal building can be seen because of the temporary wall.
I spoke to the front desk attendent at the Qantas Club on my last trip at the end of May and she said that they had done a tour of the new terminal and the new Qantas Club and Business Lounge were bigger and better than the existing facilities. |
#43
|
|||
|
|||
![]()
Cannot answer your question, but this website has some pictures of the inside.
http://www.skyscrapercity.com/showth...349537&page=15 |
#44
|
|||
|
|||
![]()
Thanks Ash, those photos give a good indication that the planned August/Sept opening date is a bit optimistic but are also good to see how the new terminal will look when completed.
|
#45
|
|||
|
|||
![]()
I came across this cool youtube clip of the aerobridge installation at CBR:
http://www.youtube.com/user/canairport?feature=mhum |
#46
|
|||
|
|||
![]()
The last I heard was an October openning of the terminal building but October is running out of days. I have heard that the building itself may be ready but the elevated road still needs work. There was something in the Canberra Times recently that the Qantas Club will be the second biggest in Australia. Has anyone heard anything to confirm that ?
|
#47
|
|||
|
|||
![]()
Terminal opening 7 November !
|
#48
|
||||
|
||||
![]()
I will believe the opening date when I am sitting behind the desk checking people in, and driving the new aerobridges
![]()
__________________
View My Photos at http://flickr.com/photos/kommissar_todd06 |
#49
|
|||
|
|||
![]()
Nov 14th opening now.
|
#50
|
|||
|
|||
![]()
The first stage of the new terminal opened yesterday, together with the new grade-separated departures and arrivals road loop. My father had a short notice trip to Melbourne this morning and I dropped him off. From what I could see the new terminal looks good. I'll be able to get some user impressions from my father when he returns tomorrow. He also was going to use the new Qantas Club lounge.
|
![]() |
|
|