Sydney Airport Message Board Sydney Airport Message Board  

Go Back   Sydney Airport Message Board > Technical > Flying and Technical Discussion
Register FAQ Calendar Today's Posts Search


Reply
 
Thread Tools Search this Thread Display Modes
  #1  
Old 9th September 2008, 02:37 PM
Philip Argy's Avatar
Philip Argy Philip Argy is offline
Senior Member
 
Join Date: May 2008
Location: North Strathfield
Posts: 1,404
Post Emirates grounds A380 flights

News just reported on The Sydney Morning Herald website:

Quote:

Airline Emirates has stopped flying its Airbus A380 superjumbo just over a month after its first commercial flight.
The airline said that planned engineering work was "taking longer than expected", but London's Telegraph reported that an electrical fault was to blame for the halt on flights.
The fault "was noticed at the end of a training mission" a spokeperson told the Telegraph. The airline denied rumours sweeping the internet forums of air travel websites that the showers in the first-class bathrooms were connected to the problem.
The Emirates A380 currently flies a Dubai-New York route. The airline said Boeing 777-300ERs would fly the route in the interim. A380 flights are scheduled to resume on September 12.
__________________
Philip
Reply With Quote
  #2  
Old 10th September 2008, 07:27 AM
James Smith James Smith is offline
Senior Member
 
Join Date: Mar 2008
Location: Cherrybrook NSW
Posts: 1,554
Default

As posted on Airline Route Updates on 30 August, 2008

Quote:
Emirates delays expanded A380 NY flight
Due to the installation of cabin interior delays on A380, Emirates has delayed the planned A380 schedule.

New York
Planned Daily A380 service from 01OCT08 appeared to be postponed till 30NOV08 at the earliest

Emirates has adjusted aircraft operation on its 2 Daily flight to cope with the delay from 01OCT08 to 25OCT08

EK203/204
Day 27: 77L
Day x27: 77W

EK201/202
Day 6: 77L
Day 124: 77W
Day 357: 380
A few reasons have been given in the various reports - installation of cabin interior delays, electrical problems and planned engineering work.

Daily services to NY have also been postponed by 2 months.

In addition, the following was posted on 4 September, 2008:

Quote:
Emirates A380 service temporarily reduction
Emirates' 3 weekly A380 service on the Dubai - New York JFK route has been temporarily reduced from 3 to 2 weekly (Day 57).

Service returns to 3 weekly from 26SEP08
Emirates are not having the smooth introduction of A380 services that Singapore Airlines enjoyed.
Reply With Quote
  #3  
Old 15th September 2008, 02:15 PM
Nigel C Nigel C is offline
Prolific Member
 
Join Date: Mar 2008
Location: The farm
Posts: 4,022
Default An update...

See http://www.news.com.au/travel/story/...014090,00.html


EK may not be happy about further delays, but their lawyers will be delighted!
Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT +10. The time now is 11:02 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright © Sydney Airport Message Board 1997-2025
Use of this web site constitutes acceptance of the Conditions of Use and Privacy Statement