Sydney Airport Message Board Sydney Airport Message Board  

Go Back   Sydney Airport Message Board > Aviation Industry News and Discussion > Australia and New Zealand Industry
Register FAQ Calendar Today's Posts Search


Reply
 
Thread Tools Search this Thread Display Modes
  #1  
Old 5th February 2012, 12:55 PM
Andrew Johnson Andrew Johnson is offline
Banned
 
Join Date: Jul 2011
Posts: 151
Default new route ex SYD needing runway dispensation

We were looking at a new domestic route ex SYD & destination ports runway does not have a high enough PCN, which I believe is the hardness of the runway ashphalt.

Runway length wasn't a problem.

How do airports in such situations treat such requests ? ie aircraft landing at airport that is probably too heavy for what the runway was planned for ?
Reply With Quote
  #2  
Old 5th February 2012, 01:02 PM
Nigel C Nigel C is offline
Prolific Member
 
Join Date: Mar 2008
Location: The farm
Posts: 4,022
Default

If the airline proposing to service the route is willing to pay for an upgrade to the pavement surface, then I'm sure the airport would consider the proposal.
__________________
I am always hungry for a DoG Steak! :-)
Reply With Quote
  #3  
Old 5th February 2012, 01:12 PM
Andrew Johnson Andrew Johnson is offline
Banned
 
Join Date: Jul 2011
Posts: 151
Default

Quote:
Originally Posted by Nigel C View Post
If the airline proposing to service the route is willing to pay for an upgrade to the pavement surface, then I'm sure the airport would consider the proposal.
there's the catch, they are not.

Silly question, but will ask it anyway - So guess the aircraft in question would eventually tear the runway apart, however, wouldn't any damage be restricted to where the aircraft actually touched down & not whole runway.
Reply With Quote
  #4  
Old 5th February 2012, 01:37 PM
Darren T. Darren T. is offline
Member
 
Join Date: Apr 2010
Location: Underneath the Radar. Sydney, Australia.
Posts: 47
Default

PCN explained simply.
http://www.airliners.net/photo/FedEx...(F)/1801406/L/
__________________
Do not believe anything you hear... People lie to further their careers.
Reply With Quote
  #5  
Old 5th February 2012, 02:12 PM
Nigel C Nigel C is offline
Prolific Member
 
Join Date: Mar 2008
Location: The farm
Posts: 4,022
Default

There's the braking forces to be considered too, as well as slow turning off the runway onto taxiways. And I presume the aircraft would be expecting to use both ends of the runway at some stage due winds etc.

But you've got to remember, even the major ports that are built to handle the big stuff have pavement issues, especially after rain and heat. I can only imagine what would happen to a small port that gets a relatively oversize bird after rain and/or heat.

Little ole country town council can't be expected to pick up the pieces when the big city folk ruin their infrastructure (infrastructure that probably runs at a loss anyway and is being funded by the community, not the users).
__________________
I am always hungry for a DoG Steak! :-)
Reply With Quote
  #6  
Old 5th February 2012, 07:51 PM
Andrew Johnson Andrew Johnson is offline
Banned
 
Join Date: Jul 2011
Posts: 151
Default

Quote:
Originally Posted by Nigel C View Post
Little ole country town council can't be expected to pick up the pieces when the big city folk ruin their infrastructure (infrastructure that probably runs at a loss anyway and is being funded by the community, not the users).
yes but little ole country town, won't get service without carrier getting dispensation or whatever it's actually called.

CATCH 22
Reply With Quote
  #7  
Old 6th February 2012, 12:24 AM
Owen H Owen H is offline
Member
 
Join Date: Dec 2008
Posts: 365
Default

The little ole country town will provide the infrastructure it needs to service the aircraft. There is no point for the community to be served by an additional larger aircraft per day (with perhaps a small decrease in fare) if it is going to mean substantially higher costs to build a larger/stronger runway.

With very limited exceptions the airline isn't running a service to be nice, it is there to make a profit. And you can't expect a small community to fund runway repairs so a company can make more profit, when the community is probably no better off.

As to where the damage occurs - Nigel would know much more about this, but it seems to me that places that aircraft turn - such as turning nodes or the runway ends, seems to be the place that sustains the most damage (or makes the most notes on Jeppesen charts to make max-radius turns at least ).

I'm sure dispensations could be attained (even if max operating weights were limited) if a sufficient benefit to the community could be demonstrated.
Reply With Quote
  #8  
Old 6th February 2012, 06:42 AM
Nigel C Nigel C is offline
Prolific Member
 
Join Date: Mar 2008
Location: The farm
Posts: 4,022
Default

Owen, I'd hazard a guess to say that about 95% of failures occur on taxiways. The screwing motion of the undercarriage in slow (and often tight) turns does wonders for suspect pavement. Also, the effects of jet blast or prop wash on the shoulders of both taxiways and runways may be an issue for smaller ports considering services from larger aircraft.

Andrew, can you let us know the final outcome?
__________________
I am always hungry for a DoG Steak! :-)
Reply With Quote
  #9  
Old 6th February 2012, 08:44 AM
Andrew Johnson Andrew Johnson is offline
Banned
 
Join Date: Jul 2011
Posts: 151
Default

Quote:
Originally Posted by Nigel C View Post
Andrew, can you let us know the final outcome?
think the answer is a long way off like 6 months or more.
Reply With Quote
  #10  
Old 6th February 2012, 09:39 AM
Nigel C Nigel C is offline
Prolific Member
 
Join Date: Mar 2008
Location: The farm
Posts: 4,022
Default

That's ok, we'll still be here.
__________________
I am always hungry for a DoG Steak! :-)
Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT +10. The time now is 04:47 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright © Sydney Airport Message Board 1997-2025
Use of this web site constitutes acceptance of the Conditions of Use and Privacy Statement