Sydney Airport Message Board Sydney Airport Message Board  

Go Back   Sydney Airport Message Board > Aviation Industry News and Discussion > Australia and New Zealand Industry
Register FAQ Calendar Today's Posts Search


Reply
 
Thread Tools Search this Thread Display Modes
  #1  
Old 28th August 2016, 08:50 AM
lloyd fox lloyd fox is offline
Prolific Member
 
Join Date: Mar 2008
Posts: 2,297
Default

Work commences in the next 2 weeks on both the Northern International apron expansion as well as the northern concourse expansion.2 new MARS gates will be joined to this concourse whilst on the western side of the concourse 4 new stand off walk on Bays will be introduced.MARS gates can accommodate 2 CODE F or 4 CODE C aircraft.

So basically BAYS 69-71 will be introduced on the western side of the concourse catering for 1 CODE F and 2 CODE E or 2 CODE C and 2 CODE E.

Gates 74 b,74A and 73B,73A will be the MARS gates attached to the eastern side of the new concourse.These will be dual aerobridge gates.

The ITB will then be able to handle 19 CODE F and E wide bodied aircraft or up to 26 aircraft if no CODE F aircraft are on the deck at the time.

SOURCE BAC for the drawings and article below.

http://www.bne.com.au/sites/all/file...28WEB%29_1.pdf

Last edited by lloyd fox; 28th August 2016 at 08:54 AM. Reason: more info
Reply With Quote
  #2  
Old 5th September 2016, 04:12 PM
lloyd fox lloyd fox is offline
Prolific Member
 
Join Date: Mar 2008
Posts: 2,297
Default

Another drawing of the ITB concourse development.

http://www.laingorourke.com/media/ne...-terminal.aspx
Reply With Quote
  #3  
Old 13th September 2016, 07:22 AM
lloyd fox lloyd fox is offline
Prolific Member
 
Join Date: Mar 2008
Posts: 2,297
Default

http://www.carpoint.com.au/news/2016...t-track-103751

If you also have a look at photo 1 you can see part of the recently completed Airpark at the top of pic 1 .This is about 40% of the actual size and is both public,staff parking as well as hire cars,coaches and taxis.

In regards to the auto mall work will commence next year.

Cheers.

PS There is so much work at BNE airport currently with aprons,concourses,Industrial lots new runway,hotels etc.
Reply With Quote
  #4  
Old 13th September 2016, 06:51 PM
James Smith James Smith is offline
Senior Member
 
Join Date: Mar 2008
Location: Cherrybrook NSW
Posts: 1,579
Default

I was up in Brisbane last week and could clearly see the sand fill settling where the new runway will be. Lloyd, when is the building scheduled to commence? Is it still years away.

Needless to say, we had 11 minutes holding over Coolangatta which gave a great view of the airport there with an A330 departing.
Reply With Quote
  #5  
Old 14th September 2016, 07:30 AM
lloyd fox lloyd fox is offline
Prolific Member
 
Join Date: Mar 2008
Posts: 2,297
Default

Morning James.

Work on the runway and taxiways commence around June,July next year and should be complete for a early 2020 start up.

I have heard both Jan and March mentioned for 2020 operations but i have also heard they are currently a few months ahead of schedule.

I hope this helps .

Cheers.
Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT +10. The time now is 04:03 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright © Sydney Airport Message Board 1997-2025
Use of this web site constitutes acceptance of the Conditions of Use and Privacy Statement